Six Documents · One CSA · One Decision

Engagement Package

Six documents. One decision: authorise an LOI/MOU and open a Joint Working Group.

01
Decision Brief
The one action, the 2031 date it sits against, and the figures behind it. Four minutes.
4 min DOC 04 Action
Open document ↗
02
Feedstock System Assessment
Fairfax’s system as it actually operates — what the E/RRF takes, where the ash goes, and what the County’s own targets say.
8 min DOC 01 Evidence
Open document ↗
03
Circular Supply Proposal
One Circular Supply Agreement. The Beneficiation Fee, the Circular Royalty™, the phases, and the condition precedent.
12 min DOC 02 Commercial
Open document ↗
04
Economic Impact Report
The 30-year model against the County’s own published rate and its own cost projections, on one stated basis.
10 min DOC 03 Model
Open document ↗
05
Community Benefits
What changes for residents across the county — and what does not. Plain language.
5 min DOC 06 Residents
Open document ↗
WHAT CHANGES
What Adopting Carbotura Changes
A plain-language tour of how a 30-year ACM commitment changes a community’s fiscal position, employment, and material system. Generic illustrative figures.
Open ↗
Planning basis: Carbotura standard parameters against VERIFIED Fairfax County figures. The Beneficiation Fee is set at $125/ton. Throughput uses the County’s own 650,000 tpy county-controlled figure. No site has been identified. Carbotura has no facility at or past Commercial Operation Date; the first is in Pennsylvania, targeted late 2027 to early 2028.